Hi!
Im building my own apporval worfklow in with Sharepoint workflow 2013.
In the mail that goes to the approver i want to ha hav a link to the current document, but i would also like to have a link to the previus major version of the current document.
I work with both major and minor versions.
Does anyone have a idea how to solw this?